Saturday 12th Nov had an early start for those wanting crane operations. From 08:30 the crane was active completing some four mast lifts, two boat lifts and one engine removal lift. All were accomplished in excellent time and stressed owners were able to have a relaxed lunch and spend the rest of the day attending to rigging etc. The pictures say most of the story.
![](https://edyc.co.uk/wp-content/uploads/2022/11/craneIMG_6375-1024x768.jpg)
![](https://edyc.co.uk/wp-content/uploads/2022/11/craneIMG_6390-1024x768.jpg)
![](https://edyc.co.uk/wp-content/uploads/2022/11/craneIMG_2810-768x1024.jpg)
![](https://edyc.co.uk/wp-content/uploads/2022/11/craneIMG_2812-1024x768.jpg)