Our EDYC mast crane is being refurbished to a better boom design to make safer and to overcome rust and deterioration. This will be done over the winter period when no mast crane work is expected at the club. The jib will be taken away and a new structure fabricated and back in time for the spring mast activity
Here are some photos of the crane being dismantled.
As always, thanks go to the volunteer workers who put their time into this task.