The EDYC pontoon bridge has been moved ashore for its winter service, which involves removing and replacing the wooden walkway planking and welding some cracks in the aluminium structure.
![](http://edyc.co.uk/wp-content/uploads/2020/11/P1020312-1024x768.jpg)
![](http://edyc.co.uk/wp-content/uploads/2020/11/P1020316-1024x768.jpg)
![](http://edyc.co.uk/wp-content/uploads/2020/11/P1020318-768x1024.jpg)
![](http://edyc.co.uk/wp-content/uploads/2020/11/P1020320-1024x768.jpg)
![](http://edyc.co.uk/wp-content/uploads/2020/11/P1020322-768x1024.jpg)
![](http://edyc.co.uk/wp-content/uploads/2020/11/P1020323-1024x768.jpg)
The seaward end of the walkway is now closed with a barrier.
Stay safe.
Work will be on-going for some months to get the best long term solution.